Electrical panel upgrades in Nanaimo

Service and panel upgrades for homes in Nanaimo and across Vancouver Island that have outgrown their electrical, from 100A to 200A and sub-panels to the planning for an EV charger, heat pump or renovation.

Certified
Red Seal, FSR A Master Electrician
Licensed
LIC-00215613, bonded and insured
Where
Victoria to Campbell River
Reply time
Two business days
A Level 2 EV charger mounted on a garage wall beside a parked car, the kind of new load that often leads to a panel upgrade.

When a panel upgrade makes sense

Most upgrades start with something new: an EV charger, a heat pump, a hot tub, a suite or a kitchen renovation. Before recommending one, I work out the load your home already carries and what the new equipment adds, so you only upgrade when the numbers call for it. Sometimes a sub-panel or a load management device does the job for less.

Older panels are the other reason: breakers that trip, a panel with no space left, or equipment that is past its working life. Either way, you get a clear explanation of what's there and what it needs before any work is booked.

How a panel upgrade goes

Load assessment first

Your existing service is checked against what you plan to add, so the upgrade is sized properly rather than guessed.

Permits and inspection

Panel and service upgrades are permitted and inspected work, and the permit, the inspection and any coordination with the utility are part of planning the job.

A planned shutdown

The power-off window is booked in advance and kept as short as possible, and every circuit is labelled when the work is done.

What affects the cost of a panel upgrade

A panel upgrade is quoted once I've seen your panel and know what you're adding. These are the things that decide the price:

The size of the job: a sub-panel, a new panel on the same service, or a full 100A to 200A service upgrade
Where the panel is, and how easy it is to reach and run new wiring to
Whether the meter base and service mast need replacing along with the panel
How many circuits move over, and any that need bringing up to current code
Load management as an alternative, where it does the job for less

Panel upgrades across Nanaimo and the mid-Island

I'm based in Nanaimo and do service and panel upgrades for homes across the mid-Island: Nanaimo itself, Lantzville, Nanoose Bay, Parksville, Cedar and Ladysmith. Many start with an EV charger or a heat pump. Further afield, from Victoria up to Campbell River, upgrades are planned around the utility's schedule like everything else.

Panel upgrade questions

If yours isn't here, ask it anyway. Every message gets an answer within two business days.

eric@horizonhues.ca
Do I need a 200A panel for an EV charger?

Not always. Many homes can add a Level 2 charger on their existing service, sometimes with a load management device. A load assessment tells you which before anything is ordered.

How long does a panel upgrade take?

It depends on the size of the upgrade, the permit and the utility's schedule. You'll know the timeline and how long the power will be off before anything is booked.

What is a sub-panel, and when is it enough?

A sub-panel adds circuit space somewhere like a garage, a shop or a suite, fed from your main panel. It works when you need more circuits but your service still has capacity to spare.

How do I know if my panel needs upgrading?

Breakers that trip often, a panel with no space left for new circuits, and lights that dim when something big switches on are the usual signs. So is planning to add an EV charger, a heat pump or a suite. A look at the panel and what you want to add settles it either way.

How do I get a quote?

Email a few details and a photo of your panel with the door open. You'll hear back within two business days, and jobs are booked in advance.

Adding something big?

Send a photo of your panel and what you're planning to add. You'll hear back within two business days.