Load assessment first
Your existing service is checked against what you plan to add, so the upgrade is sized properly rather than guessed.
Service and panel upgrades for homes in Nanaimo and across Vancouver Island that have outgrown their electrical, from 100A to 200A and sub-panels to the planning for an EV charger, heat pump or renovation.

Most upgrades start with something new: an EV charger, a heat pump, a hot tub, a suite or a kitchen renovation. Before recommending one, I work out the load your home already carries and what the new equipment adds, so you only upgrade when the numbers call for it. Sometimes a sub-panel or a load management device does the job for less.
Older panels are the other reason: breakers that trip, a panel with no space left, or equipment that is past its working life. Either way, you get a clear explanation of what's there and what it needs before any work is booked.
Your existing service is checked against what you plan to add, so the upgrade is sized properly rather than guessed.
Panel and service upgrades are permitted and inspected work, and the permit, the inspection and any coordination with the utility are part of planning the job.
The power-off window is booked in advance and kept as short as possible, and every circuit is labelled when the work is done.
A panel upgrade is quoted once I've seen your panel and know what you're adding. These are the things that decide the price:
I'm based in Nanaimo and do service and panel upgrades for homes across the mid-Island: Nanaimo itself, Lantzville, Nanoose Bay, Parksville, Cedar and Ladysmith. Many start with an EV charger or a heat pump. Further afield, from Victoria up to Campbell River, upgrades are planned around the utility's schedule like everything else.
If yours isn't here, ask it anyway. Every message gets an answer within two business days.
eric@horizonhues.caNot always. Many homes can add a Level 2 charger on their existing service, sometimes with a load management device. A load assessment tells you which before anything is ordered.
It depends on the size of the upgrade, the permit and the utility's schedule. You'll know the timeline and how long the power will be off before anything is booked.
A sub-panel adds circuit space somewhere like a garage, a shop or a suite, fed from your main panel. It works when you need more circuits but your service still has capacity to spare.
Breakers that trip often, a panel with no space left for new circuits, and lights that dim when something big switches on are the usual signs. So is planning to add an EV charger, a heat pump or a suite. A look at the panel and what you want to add settles it either way.
Email a few details and a photo of your panel with the door open. You'll hear back within two business days, and jobs are booked in advance.
Send a photo of your panel and what you're planning to add. You'll hear back within two business days.